Delivery Made- We Have the Bridge

At this time, work at the Mill Creek bridge site seems to be moving along very efficiently.
The trucks arrived a day early and unloaded early.
The drivers explained that snow storms pushed them ahead of schedule as they cannot drive with these loads in that type of weather. Well thank goodness for safe drivers!
Trees and brush are being cleared around the site to make it possible to work there.
The abutments have been inspected, power cleaned and are under repair.
Do stop and watch the progress.